Project Cost Estimate Calculator
Project Cost Estimate: a planned Super Calculator tool. Covers tasks with effort and loaded rate. Stub page while the tool and its worked example are prepared.
Project Cost Estimate Calculator is a planned calculator in the business section of Super Calculator, covering project management.
What this calculator will compute
Inputs: tasks with effort and loaded rate, materials, vendor cost, contingency (%) and three-point estimates.
Outputs: total cost (currency), cost by phase, contingency amount and PERT expected cost and standard deviation.
Formula, recorded as scope and not yet verified against a primary source: Bottom-up estimate sums task costs from effort times loaded rates plus materials and vendor cost, with contingency added as a percentage or from a three-point PERT estimate: expected = (optimistic + 4 * most likely + pessimistic) / 6.
Status
This page is a stub. The calculator is not built, no figure on this page has been verified against the authority that sets it, and nothing here should be used to make a decision. The page exists so that the site structure is complete and so that articles can link this concept on first mention.
The stub carries noindex, nofollow and is excluded from the sitemap.